Are you thinking of remodeling a bathroom? If so, there are a few steps you have to take before your dream bath comes to life. Follow along with us as we break down the steps needed to create a client’s dream powder bath!   

Phase 1: Demolition
To start from scratch, as our client’s did, all existing walls and flooring must be stripped for a clean slate.

Phase 1: Construction
After all existing walls have been stripped insulation is added for thermal control and for sound proofing the bathroom.  Drywall is then installed on all walls and plaster is applied to smooth out wall surface to prep for painting.   

Marilyn Powder Bath Phase 1 of construction.
 
 
Phase 2: Construction - Cabinetry
Once the bath’s walls are sealed and plastered it is time for cabinetry.
 
Here we installed a floating cabinet vanity. The teak wood and stainless steel drawers give a glimpse of the Marilyn Powder Bath’s modern feel. 


Phase 3: Construction - Tile + Plumbing

Before the paint is applied, now is the time to add the tile accent wall.

Here you can see the floor to ceiling wall tile and chrome detail installed in the Marilyn Powder Bath along with the built-in Kohler basalt vanity top and faucet. The countertop is a custom piece from Kohler with an integrated sink. The faucets are also customized with smoke glass handles.

 
Phase 4: Construction – Paint + Electrical
Now you can add your dream bathroom’s paint color to see it come to life!
Here we used Benjamin-Moore paint on the three existing walls and a lighter color on the coved ceiling. The coved ceiling is lit with LED lighting. The highlight of the room is the Marilyn Round Mirror.
 

Phase 6: Construction – Finish  
Here you can see the completed Marilyn Powder Bath with the frosted glass paneled door.       
  
 